Case C-984/26, Roquette Italia – free allowances, a spreadsheet and the right court
When the Commission tells a national authority to remove an installation from the list of those receiving free allowances, the operator needs to know whom to sue. Seven references from the Consiglio di Stato ask exactly that.
Facts
Roquette Italia SpA (C‑984/26), Edison Next SpA (C‑985/26, C‑989/26 and C‑990/26), Gruppo Mauro Saviola Srl (C‑986/26), Cereal Docks SpA (C‑987/26) and Cereal Docks Marghera Srl (C‑988/26) are in proceedings against the Italian Ministry of the Environment and Energy Security and the national committee that manages the emissions trading system. According to the questions, the Commission required the national body to exclude specific installations from the list of those receiving emission allowances free of charge. It set out its determinations “by means of electronic calculation templates uploaded to an IT platform”, within the dialogue mechanism of the ETS. The first question, common to all seven cases, asks whether that act must be challenged directly before the General Court. The later questions, which differ between the cases, concern when an installation that also produces electricity counts as an “electricity generator” and loses free allocation.
Questions Referred (C‑984/26)
1. In the first place, must Article 256(1), paragraphs 1 and 4 of Article 263 and Article 297(2) TFEU, Article 11(3) of Directive 2003/87/EC, establishing the emissions trading system (‘the ETS’) scheme, and Article 14 of Commission Delegated Regulation (EU) 2019/331, implementing the directive, be interpreted as meaning that the act by which the European Commission requires the national body responsible for managing the ETS scheme to exclude a specific installation from the list of installations to which emission allowances are allocated free of charge must be open to challenge on an autonomous basis before the General Court of the European Union, even though, within the framework of the ETS scheme mechanism for dialogue, the Commission sets out its determinations by means of electronic calculation templates uploaded to an IT platform, and even if the appellant economic operator intends to challenge the act on the grounds of procedural errors committed by the national body?
2. If the answer to Question 1 is in the negative, whether Article 10a(3) and (4) of Directive 2003/87/EC, under which the allocation of allowances free of charge to electricity-generating installations is not permitted, with the exception of high-efficiency cogeneration in relation to the production of heat or cooling, must be interpreted as meaning that, for a ‘fuel-powered’ sub-installation of an electricity-generating installation to be eligible for allowances free of charge, it must be directly linked to an energy efficient cogeneration process.
In the Edison Next, Saviola and Cereal Docks cases, the later questions ask instead whether an installation that “marginally generates electricity from non-high-efficiency cogeneration” is an electricity generator, and whether, after ExxonMobil Production Deutschland (C‑682/17), the concept covers an installation whose energy is “exclusively or principally intended for self-consumption” and fed into the public grid “only intermittently, for technical reasons”.
Sources
OJ notice C/2026/5976 (EUR‑Lex) · Case file on CURIA · Directive 2003/87/EC · ExxonMobil Production Deutschland, C‑682/17 (ECLI:EU:C:2019:518) · TWD Textilwerke Deggendorf, C‑188/92 (ECLI:EU:C:1994:90)
Comment
The first question matters more than its procedural framing suggests. If the Commission’s instruction is an act open to challenge before the General Court, the operators were required to bring an action for annulment within two months. Under TWD Textilwerke Deggendorf (C‑188/92), a party that could undoubtedly have challenged a Union act directly, and did not, cannot later contest its validity before a national court. A positive answer could therefore end these cases at the threshold. A negative answer keeps the dispute in the Italian courts, against the national body that removed the installations from the list.
The form of the act is what makes the question difficult. The Commission did not adopt a formal decision addressed to the operators. It set out its position in calculation templates uploaded to a shared IT platform as part of a dialogue with the national authority, which then acted. The Court has held that what counts is the substance of a measure, not its form. Whether a spreadsheet entry that a national authority is bound to follow produces binding legal effects for the operator, or is only an internal step in a national procedure, is the question the Court must answer. The Consiglio di Stato adds that the operators complain of procedural errors by the national body, which no General Court action against the Commission could cure.
The substantive questions turn on the same line drawn in ExxonMobil. There the Court held that an installation producing electricity “essentially to be used for its own needs” is an electricity generator if it “continuously feeds, for consideration, even a small part of the electricity produced into the public electricity network”. The Italian installations feed the grid only intermittently, or produce electricity only marginally. The Court will have to say whether ExxonMobil’s “continuously” is a condition or a description.